Automotive Power Telematics Lab equipment installation. SSE provided power and utility design to install new equipment including water, compressed air, drain, etc.
Schuller building addition for new equipment installation. The project includes new power system for addition, relocation of air cooled chillers, HVAC system and plumbing.
Applied Process Heat Treatment R&D facility and administration. SSE provided complete PME design with testing area power, HVAC and utility requirement.
36,000 sq.ft. Prototype Laboratory for Nissan North America
Schneider: Approximately 65,000 square feet new manufacturing facility of plastic parts including paint booth in Howell, Michigan. The design includes Chilled Water System, Compressed air, Process Water